Traveling Pakistan By Train Multan To Lahore Railroad Journey


Multan Cantonment railway station is a major railway station on Karachi Peshawar Mainline in the City of Multan Punjab It is Stops for Jaffar Express Pakistan Express, Awam Tezgam, Night Coach Mehr Express Bahaudin Zakria Express Multan Express Karachi Express and More freight and Passenger trains. 24/7 Available Today our journey on Karachi Express It runs between Karachi and Lahore. Distance between Multan and Lahore is 315 Km. Train takes 4 to 5 Hours. Khanewal is Junction Railway Station for Lalamusa Khanewal Branch line, Lodhran Khanewal on Pakistan Railways Karachi Peshawar mainline. Harappa is an archaeological site was built approximately 2600 BCE A small village on the Karachi-Lahore railway line during 1865 was named Montgomery after Sir Robert Montgomery, Later, it was made the capital of the Montgomery District. ts name was reinstated as Sahiwal in 1967 after the Sahi clan of Kharal Rajpoots who are the native inhabitants of this area Primary Owner of Sahiwal Cow Breed. The city is in the densely populated region between the Sutlej and Ravi rivers. The principal crops are wheat, cotton, tobacco, Corn, potato and oilseeds, and Sugarcane. Sahiwal power plant is Pakistan’s first supercritical coal power plant, and consists of two 660-megawatt plants a combined capacity of 1,320 MW. This is the first phase, and may be followed by a possible second phase which will include two 1,000-megawatt plants. Though the plant is now considered to be part of the China Pakistan Economic Corridor (CPEC) which was announced in April 2015, The plant was built by a joint consortium of China’s state-owned China Huaneng Group which own 51% of shares, and the Shandong Ruyi, which hold 49% of shares. The Government of Pakistan will purchase electricity from the consortium at a tariff of 8.3601 US Cents/kWh. The project was built on a build, operate, transfer basis in which the plant’s ownership will be transferred to the Government of Punjab after 30 years of operation. The project site spans a total of 1,700 acres, given by the Government of Punjab free of charge. most of the coal used for the power plant is imported from Indonesia and South Africa, and is transported by rail from the Port of Karachi and Port Qasim to the Power Plant on Pakistan’s existing railway infrastructure. Like, Share and Subscribe Tarar Support for more videos thanks..

You May Also Like

About the Author: Oren Garnes

Leave a Reply

Your email address will not be published. Required fields are marked *